1)检查设备:双登蓄电池组装完成后,检查设备是否正常,确保没有松动的部件或未连接的线缆。
1) Check the device: After the dual-access battery is assembled, check whether the device is normal and ensure that there are no loose parts or unconnected cables.
2) 测试新双登蓄电池:开启设备,观察是否能够正常启动。如果设备无法启动,检查电池连接是否牢固,极性是否正确。
2) Test the new dual-access battery: turn on the device and observe whether it can start normally. If the device does not start, check that the battery is firmly connected and the polarity is correct.
3)监测电池性能:在设备正常启动后,使用一段时间以监测电池性能。注意双登蓄电池的充电时间和使用时间,确保其正常工作。
3) Monitor battery performance: After the device starts normally, use it for a period of time to monitor battery performance. Pay attention to the charging time and use time of the dual-access battery to ensure its normal operation.
4)充电:双登电池组安装完毕后,应按产品技术文件的要求进行充电,并检查蓄电池组及其连接条的连接情况。
4) Charging: After the battery pack is installed, it should be charged according to the requirements of the product technical documents, and check the connection of the battery pack and its connection strip.
5)开路电压测试和容量测试:双登蓄电池组安装完毕投运前,应进行完全充电,并应进行开路电压测试和容量测试。
5) Open circuit voltage test and capacity test: Before the double battery is installed and put into operation, it should be fully charged, and open circuit voltage test and capacity test should be carried out.
6) 记录数据:在充、放电期间,应按规定时间记录每个双登蓄电池的电压、表面温度和环境温度及整组蓄电池的电压、电流,并绘制整组充、放电特性曲线。
6) Record data: During the charging and discharging period, the voltage, surface temperature and ambient temperature of each double battery and the voltage and current of the whole battery should be recorded according to the specified time, and the whole charge and discharge characteristic curve should be drawn.
7) 使用与维护:双登蓄电池充好电后,应按产品技术文件的要求进行使用与维护。
7) Use and maintenance: After the double battery is charged, it should be used and maintained according to the requirements of the product technical documents.
8) 外观检查:检查双登蓄电池外壳是否有裂纹、损伤、漏液等现象,确保正、负端接线柱极性正确,壳内部件齐全无损伤。
8) Appearance check: Check whether there are cracks, damage, leakage and other phenomena of the double landing battery shell, ensure that the polarity of the positive and negative terminals is correct, and the internal parts of the shell are complete without damage.
9)清洁接触点:使用清洁布清洁双登电池接触点,确保没有腐蚀或污垢。
9) Clean contact points: Use a cleaning cloth to clean the double den battery contact points to ensure that there is no corrosion or dirt.
10) 检查安装:确保所有连接都牢固,双登电池安装稳固后,重新连接设备电源。
10) Check the installation: ensure that all connections are firmly installed, and reconnect the power supply of the device after the double boarding battery is firmly installed.
11)检查电池管理系统(BMS):确保BMS集成到电池模块中,用于监测电池的充电状态、温度、电压等参数,以确保电池的安全和高效运行。
11) Check the battery management system (BMS) : Ensure that the BMS is integrated into the battery module to monitor the battery's charging status, temperature, voltage and other parameters to ensure the safe and efficient operation of the battery.
12)电池模块测试:安装完成后,电池模块需经过测试以验证其性能和安全性,包括耐压测试、短路测试、温度测试等。
这些步骤确保了蓄电池的正确安装和后续的安全性、可靠性。
12) Battery module test: After installation, the battery module needs to be tested to verify its performance and safety, including voltage test, short circuit test, temperature test, etc.
These steps ensure the correct installation of the battery and subsequent safety and reliability.